Among Our Clients

Search

Polybid Group
Manufacturer and distributor of insulation materials

Mar Gan
Importer of industrial and professional ventilation, fogging, cooling and heating equipment

Yakir Industries Ltd.
company manufacturing and marketing products for the electrical network and electrical panels

Hayanshuf Hakatan
a transport, storage and distribution company

קבוצת פוליביד

Polybid Group

Manufacturer and distributor of insulation materials

Management of the project to replace the computer systems in three factories – Polybid, Mivneh Darom and Bidtech.

Construction of a work plan, budget and schedule for the project to replace the computer systems, management and characterization of the project.

Changing the ERP system to Priority Manufacturing ERP with different work methods in each of the factories, deepening the implementation and integration into the MES system that manages the production floor, field applications for a warehouse management system (WMS), distribution for drivers, an application for salespeople and a system for managing documents and digital signatures.

The new systems created a connection between the office staff and the field staff, transparency of information, availability of information online and accuracy in inventory management.

רזפול

Razpol

Marketing of bags, nylon products and packaging

Management of the group’s information systems, management of the configuration control system replacement project and its implementation in an ERP system, deepening the implementation of the ERP system in the areas of inventory, automation and process optimization, management of a computerization project and the transfer of a logistics center – including a WMS application, management and characterization of a distribution application project, upgrades and integrations between systems, interface development and automation.

As part of the company’s application management, over the years we have added automated applications, improving the ability to manage, control and regulate the activity in the warehouses and distribution, and optimizing the relationship and working methods with their clients.

קבוצת נזיד

Nazid Group

Manufacturer/Food

Management of a computer system implementation project in three factories with different activities, while adapting to the production processes and the different needs in each of the factories, characterizing the work processes, providing a detailed characterization and determining the method of implementation, locating dedicated systems for managing niches such as managing menus and meals.

As part of the project, we provided ongoing services such as application management, examination of organizational processes, promotion of paperless work, automation and integrations.

The project constituted the establishment of the group’s computerized infrastructure and enabled precise work, traceability and growth.

ענבר אנרגיה סולרית

Inbar Solar Energy

Solar energy/planning, service establishment and maintenance of solar power systems

Project management, deepening applications in the existing ERP system, improving the infrastructure, implementing the service module –

Development of processes and documentation for the management of maintenance and service projects and tasks in preparation for the implementation of a field application for the cleaning and service personnel, further characterizing and managing the implementation of an application for the field personnel – work plans, placements, responsibilities management, and automation for opening cyclical tasks.

The project allowed the transfer of current information between all the cleaning field personnel field and the office, and allowed control of the progress of the work and efficient time planning of the field personnel.

גלרן תעשיות בע"מ


Galran Industries Ltd.

Manufacturer/Aluminum production and installation

Management of the application deepening project, characterizing the client’s needs in the procurement processes, inventory and production management, adding required information to the computing infrastructure in preparation for the application project for the field personnel. Later, project management of an application in Arabic for the installation personnel in the field, which includes reports on building and apartment serial adaptation, reports on shortages and working time.

The project allowed the online collection of accurate information from the many teams in the field. This information created savings and placed employees in appropriate and ready-to-start projects, saving time and money, as well as creating significant value for the clients who receive information about the status of progress and accurate shortages.

טופליין

TopLine

Manufacturer/import, marketing and production of office furniture

Characterization and pricing of an ERP system selection and implementation project, submitted an application for a computerization grant from the Ministry of Finance, compared between systems and selected an ERP system and an implementing supplier, managed an ERP system implementation project including management of logistics processes, finances, defining details and
inventory management. Compared between selection and management systems, characterized and implemented a dedicated system for furniture design and production. Characterized integration between the ERP system and the production system.

The computerized system made it possible to transfer a lot of information and knowledge from the founding generation to the next generation, and was one of the tools for bridging the intergenerational gap.

כרמל פרנקל

Carmel Frenkel

Manufacturer/packaging production

Information systems consulting during the process of examining the replacement of an ERP system, building a work plan for deepening the application and improving the information systems, characterizing the process of deepening the application in the M3 Infor system, adding and implementing additional tools and processes to improve control and regulation, information transparency and integration between the systems in the company’s factories

The project allowed the management to have an objective and professional examination of the replacement of their ERP system.

בלפור

Belfor

Services and projects/damage restoration after fires, floods and ecological damage

ERP system selection process management, characterization and pricing, system implementation project management including application and development supplier management, service management module, application project management and characterization for service personnel in the field, including service call management, warehouse management, technician warehouse management, service reports from the field, signing and billing clients

This project allowed online monitoring of the progress of the projects, the working time of the company’s employees and the progress of the suppliers, real-time control and monitoring of the project budget.

כללית הנדסה רפואית

Clalit Medical Engineering

Health services/medical equipment service and maintenance

Accompanied the chief information officer in an application deepening project in the information system.

The purpose of this project was the characterization and documentation of the existing information systems for the purpose of improving the maintenance and monitoring abilities, and later completed an application streamlining and deepening project in the existing systems, examining and comparing between expert systems with integration to the ERP system.

משרד האנרגיה

The Fuel and Gas Administration

Government/management of energy and natural resources of the State of Israel

Examined the need to replace the business process management system, made a decision not to replace the system and to improve and deepen the implementation in the existing system.

Managed a mapping and characterization project to improve the application, processes and user interface, working with the organization’s internal development team.

ציוד בע"מ

Equipment Ltd.

Equipment importer/import, sale and service of forklifts and transportation equipment

Accompanied and advised the company on information systems throughout several projects, characterizing the deepening of the application infrastructure in SAPB1 in preparation for the application project for the field technicians. Compared between applications for field technicians, selected a system and an implementing supplier, characterized and managed an implementation project and integration with the SAPB1 system, accompanied and implemented it among the office and field staff.

This project enabled transparency and ongoing transmission of information between the field and the office personnel, bringing forward the billing date and controlling the tasks and their progress.

תירוש דויד יציקות

Tirosh David Castings

Manufacturer/aluminum castings

ERP system selection project management, analysis of requirements, comparison between possible systems, examination and analysis of gaps between an existing self-developed system and the other possible systems. At the end of the process, a Kitaron system was chosen. Submitted an application for a computerization grant from the Ministry of Finance.

This project provided an understanding of the alternative options and the costs the company would face.

אף אנד סי ליקוריס

F&C Licorice

Manufacturer/production of flavorings for the tobacco industry, food additives and spices

Managed an efficiency project in the group’s factories, deepening of implementation in the existing ERP system, added production management processes, deepened infrastructures in preparation for the application project for production reports, managed a characterization and implementation project of an application for production reports, characterized and implemented an application for quality management with integration into the ERP system.

This project eliminated the paperwork on the production floor and computerized the production and quality reports, receiving information online and meeting audit requirements.

מר גן

Mr Gan

Importer of industrial ventilation, cooling and heating equipment

Managed the ERP system implementation project for the management of the company, characterized and defined the needs and processes in the ERP system, a continuation project for an application for the salespeople that connected to the ERP system online.

This project enabled the mechanization and automation of processes, which later enabled the transfer of knowledge in a computerized form to the organization’s employees, allowing the automation and growth of the company.

Eenerjet

Perfection Technologies

Manufacturer/medical devices, medical aesthetics equipment

Characterization and management of a project that enabled the transfer of essential information from the end product produced by the company to the ERP system.

The connection between the systems and the transfer of information enabled the collection of essential information for the purpose of customer support, data flooding and analysis. This project enabled the collection of information that contributed to the company’s business value.

AVI Refrigeration

Logistics center/deep freezing storage of food products

Project management for the establishment of information systems for the management of a TPL logistics center – a logistics center that allows storage for external entities.

Accompanied the process of setting up the logistics center, characterizing and designing the work processes, choosing an ERP system, choosing an application and hardware for warehouse management systems (WMS).

This project allowed the preparation of the information systems at the same time as the establishment of the logistics center, and the immediate operation of the logistics center after the completion of construction.

יקיר תעשיות

Yakir Industries

Manufacturer/production and marketing of products for the electrical network and electrical panels

Managed an application reduction project. The company had several applications in addition to an ERP system. The synchronization between the applications was partly manual and required double entry of data.

As part of this project, we replaced the applications with one application connected to the ERP system, thereby creating a continuous connection between the field data and the ERP system, saving work time and reducing manual work time.

קבוצת מוריה

Morya Group

Nursing homes and services/nursing homes, nursing care workers and medical services

Information systems consulting in several projects, characterization project, comparison and selection of a system for assigning shifts for workers with the aim of providing a solution for the management of work in the office and for field personnel, consulting for signing contract for an emergency room management system in order to improve the required services and the pricing and costs methods of the project.

Environmental Sustainable Development

Projects/accompaniment and environmentally friendly planning – buildings, neighborhoods, roads and railways

Characterization of a project management system and an examination of alternative options. Characterization of an application for managing the control activity on dirt removal.

As part of this project, the requirements for the information systems were defined, and a cost estimate was given for the implementation of the project.